- “BYD HVM 16.6 + KOSTAL PLENTICORE PLUS 10 G2 HV STORAGE SYSTEM, 16.56 KWH USABLE, 3-PHASE” already exists in your wishlist
DOME 6.0 PEAK FOR MOUNTING THE DOME 6.0 SYSTEM
Component for the roof-parallel module mounting of the Dome Zero System. The peak is attached to the BasicRail using a cylinder head screw and MK2.
Material: Aluminium EN AW-6063 T66
|
Component for the roof-parallel module mounting of the Dome Zero System. The peak is attached to the BasicRail using a cylinder head screw and MK2.
Material: Aluminium EN AW-6063 T66
|
Reviews
There are no reviews yet.