Compare“SP600S OPTIMIZER VOLTAGE: 8-80 V, CURRENT ISC: 20.0 A” has been added to the compare list
“SP600S OPTIMIZER VOLTAGE: 8-80 V, CURRENT ISC: 20.0 A” was added to the compare list
Roll over image to zoom in
Click to open expanded view
Test bench with 5, 10, 20 or 40 test positions
Phases: 1 or 3
Phases |
|
Scope of application |
- Testing of energy meters
- Testing of Smart Meters
- Combined with a power source system e.g. MTS140 this test bench is used as a single-phase meter test system with 40 test positions.
- Combined with a power source system e.g. MTS310 this test bench is used as a three-phase meter test system with 10 test positions.
- Combined with a power source system e.g. MTS320 this test bench is used as a three-phase meter test system with 20 test positions.
- Combined with a power source system e.g. MTS340 this test bench is used as a three-phase meter test system with 40 test positions.
|
Main functions |
- Single- or three-phase meter testing
|
Specials |
- Extendable by MTS components
- See detailed description for variants
|
|
Reviews
There are no reviews yet.